Laboratory Equipment

Sign up for Lab News Daily

 Facebook  YouTube Twitter   tumblr 

 


Site Sponser







Home > Resources > Featured Editorial

Read/Post Comments

Space Station Repairs Underway

August 11, 2010

NASA scrambled Monday to put together a new plan of attack to get the International Space Station back to full cooling, following this past weekend's unsuccessful repair effort.

A jammed connector and ammonia leak prevented two spacewalking astronauts from removing a broken pump Saturday. Until the pump is replaced, the space station has to limp along on only half its cooling capability. The system isn't for the astronauts' comfort, but rather keeps electronic equipment from overheating.

NASA is targeting today for the next spacewalk to remove the bathtub-size pump. If successful, a spare would be installed during a third spacewalk Sunday.


The cooling-loop shutdown— one of the most serious space station breakdowns ever— occurred more than a week ago.

One of two U.S. cooling lines at the orbiting lab became inoperable when the pump shut down July 31. The six-person crew turned off unnecessary equipment and halted science research so as not to overtax the system; experiments remain on hold.

Under the latest plan, flight controllers will relieve pressure in the ammonia coolant lines leading to the failed pump, over the next day. Then when the spacewalkers venture out, they will close a pair of upstream valves to stop the flow of ammonia to the balky, leaky line that remains connected to the pump, and vent out any residual ammonia.

Hopefully, all that will enable Douglas Wheelock and Tracy Caldwell Dyson to disconnect the troublesome ammonia line without major leakage. They also will need to disconnect power and data cables before they can unbolt the disabled pump.

Saturday's spacewalk by Wheelock and Caldwell Dyson lasted an extraordinarily long eight hours. Today’s excursion would be limited to about six hours. In Houston, a pair of astronauts rehearsed the spacewalk procedures Monday in NASA's massive training pool.

NASA wants to correct the problem quickly, just in case a problem develops with the one good cooling line. If that happened, the space station would be in a precarious situation. There would be only a limited amount of time for emergency repairs before the crew would have to abandon ship.

The space station is supposed to continue operating until 2020. After next year, it will have to get by without any more shuttle visits.

Only two shuttle delivery missions remain, in November and February 2011. A third shuttle flight, next summer, would need White House and Congressional approval.

Source: The Associated Press 


Contact Editor Print Article Email To Friend

Comments
Type Your Comment...
Name:   
E-mail (optional) *E-mail addresses do not publish to the site.
Comment:   


Editor's Corner

michelle
Michelle Longo
Asst. Managing Editor

Striving Toward Secondary Goals
Late last month, Republican presidential candidate Newt Gingrich stunned most everyone when he declared his promise that "by the end of my second term, we will have the first permanent base on the moon." While I don’t fault Gingrich for dreaming and trying to set high standards and goals, I can’t help but think of the enormous amount of known and unknown variables that significantly deter this accomplishment...continue

Application Notes
More

Most Viewed Content
Advantage Business Media © Copyright 2011 Advantage Business Media
Privacy Policy |  Terms & Conditions |  Advertise with Us 

Top Stories and Headlines
EVERY DAY!

FREE Email Newsletter